Paladon Systems has completed a big batch of Hydraulic Spring Return Actuators, Model HYD-8-78-SRC10F. They will be installed in Oman, for BP, in the Khazzan Gas Project – Block 61 Khazzan, Makarem. These Actuators have a cabinet with sand louvres installed and Control System includes a Switch Box with Local Indicator and two Solenoid Valves.
上一条:Tapis RX asset restoration and maintenance support Project, for Exxon Mobil
下一条:Zakum West Upper EZ174-provision for fuel gas system at ZWSC GGII Project |
返回列表 |
联系人: Jason Zhang
总部联系电话: + 86 186 0173 2223
24小时客服电话: 400 058 3699
邮箱: jason@paladonsystems.com.cn
网址: www.paladonsystems.com.cn
地址: 上海市松江区小昆山镇港业路158弄2号F396幢