Language:CN

Email

新闻中心

公司始终以“高品质、高性能、有竞争力的价格”为经营方针

产品广泛应用于国内外的电力、水处理、石油&天然气、冶金等工业自动化核心控制领域

新闻中心

公司新闻

FP-56 Marlim Sul Field development Project
发布时间:2022-08-17      点击次数:376

63e096d5c646b744c396f02b4c0fb901.jpg

Paladon Actuators to Brazil


Ending the week with the completion and shipment of a batch of Pneumatic Spring Return Actuators, Model PND-31M-2290-SRC4H. They will be sent to Brasil for FP-56 Marlim Sul Field development, Petrobras. These Actuators have a Panel mounted on board with a quick exhaust valve for fast operations and a Limit switch box with Local Indicator and Solenoid Valve integrated.


您感兴趣的新闻
上一条:4144 Wellhead Workover Project
下一条:Dragon LNG Project

返回列表


联系人: Jason Zhang

总部联系电话: + 86 186 0173 2223

24小时客服电话: 400 058 3699

邮箱: jason@paladonsystems.com.cn

网址: www.paladonsystems.com.cn

地址: 上海市松江区小昆山镇港业路158弄2号F396幢